Exterior Wall of Manufactory center IWC Schaffhausen, Schaffhausen, Switzerland

  • Anvendelsesområde:
  • Industribyggeri
  • Kontorbyggeri
Fuld skærm Luk

Bolted connections for a noble logo wall

Peikko's bolted connections are ideally suited for wall panels in addition to the classic application for columns. The external wall of the IWC Schaffhausen manufacturing center serves as an example. The column shoes and anchor bolts were used as a connection for a prefabricated wall panel that has to withstand all weathers. It proved to be the simplest and most economical solution.

The simplest and best solution.

Alexandra Pieler, ATP architekten ingenieure Zürich AG

Projekt information

Enterprenør:
Walo Bertschinger Central AG
Konstruktionsingeniør:
ATP architekten ingenieure Zürich AG
Arkitekt:
ATP architekten ingenieure Zürich AG
Elementleverandør:
K. Studer AG
Leveringsår:
2017
Afleveringsår:
2017

Vi leverede følgende løsninger