MONDI Ružomberok Paper Mill, Ružomberok, Slovakia

  • Anvendelsesområde:
  • Industribyggeri
Fuld skærm Luk Steet view

The anchoring of the columns with the foundations was realized using the Peikko® anchor system. 

The main primary prefabricated beams were placed on the column corbels and were connected to the columns using BECO® beam shoes and COPRA® anchoring couplers. 

Projekt information

Projektudvikler:
Mondi SCP, a. s.
Enterprenør:
STRABAG Pozemné a inžinierske staviteľstvo s.r.o.
Konstruktionsingeniør:
STAT-KON s.r.o.
Elementleverandør:
STRABAG Pozemné a inžinierske staviteľstvo s.r.o.
Leveringsår:
2019
Afleveringsår:
2020

Vi leverede følgende løsninger

Mihálek Gabriel Ing.

Mihálek Gabriel Ing.

Manažér predaja Slovensko

Mob. 00421/911 260 499
[email protected]