PRD Logistics Warehouse, Corbas, France

  • Anvendelsesområde:
  • Lagerbyggeri
Fuld skærm Luk

A new logistics building of nearly 77,000m² which is divided into nine cells. The PETRA® Slab Hangers allowed a quick installation of the hollow-core slabs.

This is the first time using PETRA® Slab Hangers for the Eurobéton team. The installation of the floor was made easier by thier use

Projekt information

Projektstørrelse:
77,000 m2
Projektudvikler:
PRD
Arkitekt:
Eric Sainero
Elementleverandør:
Eurobeton France

Vi leverede følgende løsninger

Sabri ALPTUNA

Sabri ALPTUNA

Directeur commercial adjoint

Mob. +33 (0) 6 47 86 91 55
[email protected]