RHKW waste burning plant, Linz-Mitte, Austria

  • Anvendelsesområde:
  • Energi
Fuld skærm Luk

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Projekt information

Projektudvikler:
LINZ AG
Enterprenør:
Bilfinger Berger BauGmbH, Linz
Konstruktionsingeniør:
BHM Ingenieure, Linz
Elementleverandør:
HABAU Hoch- und Tiefbau, Perg
Leveringsår:
2010
Afleveringsår:
2011

Vi leverede følgende løsninger

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Mob. +43 664 381 74 05
[email protected]