Vilnius Airport Passengers Terminal, Vilnius, Lithuania

  • Anvendelsesområde:
  • Andet Offenligt Byggeri
  • Infrastruktur
Fuld skærm Luk

The renovated passenger terminal of Vilnius airport has 6 departure gates. here have been opened 6 departure gates at the renovated passenger terminal of Vilnius airport, also The airport itself was equipped with modern passenger registration facilities, a shopping center and a business club, as well as a room for VIP passengers. The renovation also includes a parking lot in front of the passenger terminal.

 Peikko delivered various steel structures for this project.

Projekt information

Projektstørrelse:
5 000 m2
Enterprenør:
AB YIT Kausta
Leveringsår:
2006
Afleveringsår:
2007

Vi leverede følgende løsninger

    Saulius Grigas

    Saulius Grigas

    Pardavimų grupės vadovas

    Plieninės konstrukcijos, DELTABEAM sijos

    Mob. +370 614 40120
    [email protected]